Utah building code

Utah has adopted 2024 IBC based on 2024 IBC (incl. Appendices C and J). The table below lists the governing edition for every discipline a plan check touches, followed by the Utah cities and counties that amend it locally.

Current edition
2024 I-Codes (IBC/IPC/IMC/IFGC/IECC/IEBC/IFC/ISPSC-res) + 2023 NEC + 2021 IRC, Utah Code Title 15A, effective 2026-07-01
Prior edition
2021 I-Codes (IBC, IRC, IPC, IMC, IFGC, IECC, IEBC, ISPSC-res) with 2023 NEC (version of 15A-2-103 effective 7/1/2025)
Code authority
Utah Legislature via Utah Code Title 15A (State Construction and Fire Codes Act); administered by the Division of Professional Licensing (DOPL) for construction codes and the Utah Fire Prevention Board / State Fire Marshal Division for the State Fire Code

Edition changeover: Projects with a complete application on or before 2026-06-30 may still be reviewed under the 2021 I-Codes (IBC, IRC, IPC, IMC, IFGC, IECC, IEBC, ISPSC-res) with 2023 NEC (version of 15A-2-103 effective 7/1/2025).

Adopted code by discipline

Adopted code editions and local amendments by discipline
DisciplineAdopted codeLocal amendment
Building2024 IBC based on 2024 IBC (incl. Appendices C and J)n/a
Residential2021 IRC based on 2021 IRC (incl. Appendix AQ; Appendix AE/F per statute)n/a
Existing buildings2024 IEBCn/a
Fire2024 IFC based on 2024 IFC (excluding appendices)n/a
Electrical2023 NEC based on NFPA 70, 2023 editionn/a
Mechanical2024 IMCn/a
Plumbing2024 IPCn/a
Energy2024 IECCn/a
Fuel Gas2024 IFGCn/a

Overlays that can apply

Mapped hazard and district overlays stack on top of the adopted code. These are the overlays recorded for Utah. They apply by parcel, not jurisdiction-wide, so confirm the parcel before assuming one is in play. Check CAL FIRE's fire hazard severity viewer and FEMA's flood map service.

  • Seismic design category overlay
  • Wildland-urban interface area

Sources

Common questions

What building code does Utah use?

Utah uses 2024 IBC based on 2024 IBC (incl. Appendices C and J). It is administered by the Utah Legislature via Utah Code Title 15A (State Construction and Fire Codes Act); administered by the Division of Professional Licensing (DOPL) for construction codes and the Utah Fire Prevention Board / State Fire Marshal Division for the State Fire Code. The prior edition was 2021 I-Codes (IBC, IRC, IPC, IMC, IFGC, IECC, IEBC, ISPSC-res) with 2023 NEC (version of 15A-2-103 effective 7/1/2025).

Do cities in Utah amend the state code?

Local amendments are adopted by ordinance at the city or county level. Confirm with the building department that reviews your permit.

Which edition applies to a permit already in review in Utah?

Projects with a complete application on or before 2026-06-30 may still be reviewed under the 2021 I-Codes (IBC, IRC, IPC, IMC, IFGC, IECC, IEBC, ISPSC-res) with 2023 NEC (version of 15A-2-103 effective 7/1/2025).

Check a plan set against Utah code

Knowing the adopted edition is the easy half. Architechtura reads your drawings, resolves which of these provisions actually apply to the project, and returns the corrections a plan checker would write up, each one cited to the section it came from.

Your first check is free, no card required.

Compiled from published state and municipal adoption ordinances. Local governments amend their codes on their own schedule, and a pending ordinance can change what applies to your permit. Confirm the governing edition with the building department before you submit. This page is reference information, not a code determination.