West Hollywood enforces 2025 CBC, T24 Pt 2 based on 2024 IBC with 2 local amendments on top (Ord. 25-26). The amendments are the part that gets sets corrected. The state edition is only the floor. West Hollywood sits in Los Angeles County.
Current edition
2025 Title 24
Prior edition
2022 Title 24
Edition changeover: Projects with a complete application on or before 2025-12-31 may still be reviewed under the 2022 Title 24.
Adopted code and local amendments by discipline
Adopted code editions and local amendments by discipline
Discipline
Adopted code
Local amendment
Building
2025 CBC, T24 Pt 2 based on 2024 IBC
West Hollywood local amendments, Ord. 25-26Local text supersedes the state code
Residential
2025 CRC, T24 Pt 2.5 based on 2024 IRC
n/a
Existing buildings
2025 CEBC, T24 Pt 10 based on 2024 IEBC
n/a
Fire
2025 CFC, T24 Pt 9 based on 2024 IFC
n/a
Electrical
2025 CEC, T24 Pt 3 based on 2023 NEC
n/a
Mechanical
2025 CMC, T24 Pt 4 based on 2024 UMC
n/a
Plumbing
2025 CPC, T24 Pt 5 based on 2024 UPC
n/a
Energy
2025 Energy Code, T24 Pt 6
n/a
Green / sustainability
2025 CALGreen, T24 Pt 11
n/a
Accessibility
2025 CBC Ch 11A/11B, T24 Pt 2
n/a
Wildland-urban interface
2025 CA-WUIC, T24 Pt 7 based on 2024 IWUIC
n/a
Historical buildings
2025 CHBC, T24 Pt 8
n/a
Administrative
2025 CAC, T24 Pt 1
n/a
Zoning
No state-adopted code
Local zoning ordinance (city or county), subject to state preemptionLocal text supersedes the state code
What West Hollywood actually amended
Quoted from the adopted ordinance. These are the provisions that differ from the state code, which is where most correction lists come from. Excerpts, not the whole ordinance. Follow the source link for the full text.
103.9 · Application for Permit
103.9 Application for Permit.
----- page 15 -----
Ordinance No 25-26
Page 15
65267.00035\44440719.2
When no permit is issued within 18 months following the date of the application therefor,
the application shall automatically expire. Plans and specifications previously submitted
may thereafter be returned to the applicant or destroyed by the Chief Plumbing Inspector. […]
104 · Building Official. The office of Building Official exists in the Building and
Section 104 of the Mechanical Code is amended to read as follows:
104. Building Official. The office of Building Official exists in the Building and
Safety Division of the City of West Hollywood. The Building Official shall administer the
provisions of this Code and shall be well versed in accepted mechanical engineering
practices and techniques, construction and installation methods, and in the statutes of
the State of California and the ordinances of the City of West Hollywood relating to
heating, ventilating, comfort cooling, refrigeration systems, and other miscellaneous
heat-producing equipment.
b.
106.2.7 · Construction Debris Control. The Federal Clean Water Act prohibits the
106.2.7 Construction Debris Control. The Federal Clean Water Act prohibits the
discharge of any material other than storm runoff to the storm sewer system. The City
streets adjacent to or serving all properties in West Hollywood are part of the storm sewer
system. It shall be the responsibility of the owner of property upon which construction
----- page 29 -----
Ordinance No 25-26
Page 29
65267.00035\44440719.2
work, of any type, takes place to provide a plan for controlling discharges of construction
debris in order to prevent the discharge of such debris to the storm sewer system. […]
106.4.1.1 · Expiration of Application
106.4.1.1 Expiration of Application.
When no permit is issued within 18 months following the date of the application
therefor, the application shall automatically expire. Plans and specifications previously
submitted may thereafter be returned to the applicant or destroyed by the Building Official.
The Building Official may grant up to two extensions not exceeding 180 days per
extension, beyond the initial 18 month limit upon written request by the applicant showing
that circumstances beyond the control of the applicant have prevented action from being
taken and upon the payment of an extension fee as determined by the Building Official,
not to exceed 25 percent of the plan check… […]
106.4.3.1 · Construction Debris Control
106.4.3.1 Construction Debris Control.
The Federal Clean Water Act prohibits the discharge of any material other than
storm runoff to the storm sewer system. The City streets adjacent to or serving all
----- page 4 -----
Ordinance No 25-26
Page 4
65267.00035\44440719.2
properties in West Hollywood are part of the storm sewer system. It shall be the
responsibility of the owner of property upon which construction work, of any type, takes
place to provide a plan for controlling discharges of construction debris to prevent the
discharge of such debris to the storm sewer system. […]
111.2 · Permit Application
111.2 Permit Application
When no permit is issued within 18 months following the date of the application
therefor, the application shall automatically expire. Plans and specifications previously
submitted may thereafter be returned to the applicant or destroyed by the Chief
Mechanical Inspector. The Chief Mechanical Inspector may, before or after expiration of
the application, grant up to two extensions not exceeding 180 days per extension, beyond
the initial 18 month limit upon written request by the applicant showing that circumstances
----- page 20 -----
Ordinance No 25-26
Page 20
65267.00035\44440719.2
beyond the control of the applicant have prevented action from being… […]
301.2.2.1 · In existing buildings or premises in which plumbing installations are to
301.2.2.1 In existing buildings or premises in which plumbing installations are to
be altered, repaired, or renovated, deviations from the provisions of this Code are
permitted, provided such deviations are found to be necessary and are first approved by
the Administrative Authority.
Any plumbing system may have its existing use, maintenance, or repair continued
when the Administrative Authority determines that its use, maintenance or repair is in
accordance with the original design and no hazard to the public health, safety, or welfare
has been created by such system.
301.2.2.2 · Existing building sewers and building drains may be used in connection
301.2.2.2 Existing building sewers and building drains may be used in connection
with new buildings or new plumbing and drainage work only when they are found on
examination and test to conform in all respects to the requirements governing new work,
and the proper Administrative Authority shall notify the owner to make any changes
necessary to conform to this Code. No building or part thereof, shall be constructed of
materials other than those approved elsewhere in this Code for use under a building. […]
9924.1 · When the Board finds that any property is substandard property, it is
9924.1. When the Board finds that any property is substandard property, it is
hereby declared a public nuisance and based upon its findings, the Board shall order the
abatement of the nuisance by such means as the Board deems most feasible. If such
means includes the removal of any vehicle or any part thereof, such order shall include
a description of such vehicle and the correct identification number and license number,
if available at the site. […]
R106.2.1 · Construction Debris Control
R106.2.1 Construction Debris Control.
The Federal Clean Water Act prohibits the discharge of any material other than
storm runoff to the storm sewer system. The City streets adjacent to or serving all
properties in West Hollywood are part of the storm sewer system. It shall be the
responsibility of the owner of property upon which construction work, of any type, takes
place to provide a plan for controlling discharges of construction debris in order to prevent
the discharge of such debris to the storm sewer system. No construction work shall take
place until such plan is approved by the Director of Public Works or his/her designee. […]
Mapped hazard and district overlays stack on top of the adopted code. These are the overlays recorded for Los Angeles County. They apply by parcel, not jurisdiction-wide, so confirm the parcel before assuming one is in play. Check CAL FIRE's fire hazard severity viewer and FEMA's flood map service.
Very High Fire Hazard Severity Zone
FEMA mapped flood hazard area
State law that overrides local zoning here
When one of these applies, the state statute governs over a conflicting local standard. This is the most common reason a local rule someone quotes you turns out not to be enforceable against a project.
Gov. Code 66310 et seq.
State ADU law preempts local zoning that would preclude a conforming ADU/JADU.
Applies when: project includes an ADU or JADU
Gov. Code 65915
State Density Bonus Law concessions/waivers override local development standards.
Applies when: project requests a density bonus
Gov. Code 65852.21 / 66411.7
SB 9 urban lot split / two-unit ministerial approval preempts conflicting local standards.
Applies when: project is an SB 9 lot split or two-unit development
West Hollywood enforces 2025 CBC, T24 Pt 2 based on 2024 IBC, the edition adopted statewide in California, amended locally in 2 disciplines (Ord. 25-26).
Does West Hollywood amend the California code?
Yes: building, zoning. For building, the rule is: local text supersedes the state code.
Where do I confirm the code edition for a West Hollywood permit?
With the city building department that will review the permit. Adoption ordinances are amended on a local schedule, and a set submitted days apart can fall under different editions during a changeover.
Knowing the adopted edition is the easy half. Architechtura reads your drawings, resolves which of these provisions actually apply to the project, and returns the corrections a plan checker would write up, each one cited to the section it came from.
Compiled from published state and municipal adoption ordinances. Local governments amend their codes on their own schedule, and a pending ordinance can change what applies to your permit. Confirm the governing edition with the building department before you submit. This page is reference information, not a code determination.